您当前的位置:
首页 >
文章列表页 >
Rework placement system applied in ICCD fiber optic taper mounting procedure
更新时间:2025-09-01
    • Rework placement system applied in ICCD fiber optic taper mounting procedure

    • Issue 2, Pages: 241-243(2008)
    • Published:2008

    移动端阅览

  • Rework placement system applied in ICCD fiber optic taper mounting procedure[J]. 2008, (2): 241-243. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

148

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis for the resolution change of ICCD caused by fiber optic taper coupling
Study of the optic taper coupling technique in partially light-controlled imaging detector
Energy transmission process of ICCD UV warning system
Research on SNR of UV warning system imaging
A novel method-based on forced-choice for MRC measurement

Related Author

高稚允
白廷柱
崔志刚
王水威
刘术林
郜海阳
杨旭三
唐远河

Related Institution

2:北方夜视科技集团微光器件中心西安分部
1:西安理工大学理学院
2:北京华北光学仪器有限公司
1:北京理工大学光电学院
1:哈尔滨工业大学光学目标仿真与测试技术研究所
0